SLS Build Data tracking

From: Scott Tilton (stilton@protoprod.com)
Date: Tue Jan 07 2003 - 21:24:36 EET


This may seem like a really simple question but I'll ask it anyway.

I'm trying to keep better records on the time that the Sinterstation is in
use this year.

The default settings generate and "end of build" message after the part bed
temperatures drop to 85C.

However in reality . .. the safety logic system won't let you open the door
until the temperature drops to a predetermine "safe" level.

So in essence . .the machine is still in use . . and really the build is not
"complete."
(Yes I know there are ways around this and you can fool the temperature
sensors so the door can be opened early. That isn't what I'm trying to do)

I'd like the "build complete" message to come AFTER the temperatures have
dropped below the pre-set safety levels so that the door can be opened.

Can I simply drop the part heater set point to 50C for the last .005" of the
build to accomplish this?

I'll admit that I've haven't ever tampered much with the cool down stage
settings before, and when I have, a few times I've screwed up and generated
some error messages.
So I thought I'd check with the RPML brain trust before I tried it.

Plus . . I haven't seen an SLS comments on here for a while so I thought I'd
throw one in.

Thanks in Advance.

Scott Tilton



This archive was generated by hypermail 2.1.7 : Sat Jan 17 2004 - 15:16:59 EET