Hi Jan,
> RPC 300 ND for my SLA350 meant that the SL5190 times for predip delay (30
to
> 35 sec) and zwait (12 to 15 sec) have come down to pre dip delay of 0 sec
> and zwait also 0 sec.
>
> for a 200 mm high build at 0.1mm layer thickness means the 50 sec saving
> amount to a whopping 27.7 hours reduction.
Can you say what you are left with then as a "typical" time per layer
and typical build time for a vat-filling item?