Re: RP of Die Cast Parts
From:
Frost Prioleau (Plynetics Express Corporation)
Date:
Wednesday, September 28, 1994
From: Frost Prioleau (Plynetics Express Corporation)
To: Douglas vanPutte (Eastman Kodak Company)
Cc: RP-ML
Date: Wednesday, September 28, 1994
Subject: Re: RP of Die Cast Parts
Doug et al-
For many configurations, the best way to rapidly prototype die-cast parts is
by using RP patterns in conjunction with the Rubber/Plaster Mold (RPM) process.
Using this process, cast parts in aluminum, magnesium or zinc can be
produced about 1 to 1.5 weeks after completion of the master. RP masters
must be finished out very carefully to ensure that no undercuts exist.
As a service bureau, we have used this process on well over 100 geometries
with a company called Metalcast Engineering, who we think is the best in the
industry. Randy Erickson is the contact at Metalcast. He can be reached at
"erickson@metalcast.com" or by phone at 510-534-2320.
Good Luck
Previous message
| Next message
Back to 1994 index